Built for Certification. Designed for You.

CIVIRES combines powerful requirements management, intelligent document automation, and project-centric workflows into one system purpose-built for airworthiness.

The Feature That Changes Everything: Automatic Bidirectional Linking

Fill out your compliance matrix in CIVIRES, and the system automatically maintains bidirectional links between requirements and documents. Change the compliance showing? The documents update. Revise a document? The matrix reflects it. Always in sync. Zero manual work.

Bidirectional linking between requirements and documents

Requirements and documents stay perfectly synchronized

Eliminate Manual Synchronization

No more hours spent cross-checking spreadsheets against documents. No more version control headaches.

Zero Disconnect Risk

Requirements and documents are connected in the database. If compliance showing changes, every affected document knows about it instantly.

Audit-Ready Traceability

Complete traceability from requirement to compliance showing to supporting document—automatically generated, always accurate.

Massive Time Savings

What used to take hours (or days) of tedious cross-checking now happens automatically. Your engineers do engineering, not Excel archaeology.

Compliance Matrix Management

CIVIRES puts the compliance matrix at the center of everything. It's not just a checklist—it's your project's nervous system.

Compliance checklist view
Compliance Matrix interface showing EASA CS-23 requirements
Image 1 of 2

Compliance checklist view

TCDS-Based Certification Basis

Start with pre-loaded Type Certificate Data Sheets for your aircraft type. CIVIRES automatically imports applicable requirements from EASA, FAA, ASTM, etc. Begin with a solid foundation, not a blank page.

Project-Specific Requirements

Add special conditions, ELOS, exemptions, elections to comply, and applicant-defined requirements. Add and link System Level requirements. Track their lifecycle—proposed, accepted, validated.

Intelligent Organisation

Structure requirements hierarchically. Group by system, certification spec, or custom categories. Filter, sort, search instantly. Find what you need in seconds, not minutes.

Compliance Showing Visibility

See at a glance: Which requirements are satisfied? Which need attention? What's in progress? Color-coded status, progress tracking, instant reporting.

Real-Time Dashboards

Track activities, milestones, compliance status, and resources across all your projects. Multi-project portfolio view ensures everyone sees where each project stands.

Dashboard showing compliance status by discipline
Dashboard showing compliance by document type
Image 1 of 2

Compliance dashboard organized by discipline

Pre-Loaded Regulatory Library

CIVIRES comes pre-loaded with extensive regulatory requirements so you can start working immediately—not spend weeks building your requirements database.

EASA Certification Specifications

Complete CS-23, CS-25, CS-27, CS-29, CS-E, CS-P, and more—continuously updated as amendments are published. Always current, always accessible.

FAA Federal Aviation Regulations

Full FAR Part 23, 25, 27, 29, 33, 35, and related regulations—synchronized with official FAA database. Maintain global certification capability.

TCDS Coverage

Pre-loaded Type Certificate Data Sheets for major aircraft types. Need more? We can add them.

Custom Standards

Need EUROCAE, ASTM, SAE, or other industry standards? Want to put your system requirements in CIVIRES? We can load customer-specific requirements into your system.

Project Management Integration

Certification activities aren't separate from your project—they're integral to it. CIVIRES bridges the gap between airworthiness and project management.

Project timeline Gantt visualization with named activities

Timeline and Gantt visualization with certification activities

Project-Centric Organisation

Organize work in certification projects. Each project has its compliance matrix, milestones, activities, documents, and stakeholders. Complete oversight in one place.

Timeline & Gantt Visualization

Visualize project schedules with certification activities integrated. Spot dependencies, identify bottlenecks, adjust resources—all from one view.

Automatic Status Management

Track certification activities through stages. Move Projects from "Planned" → "In Execution" → "Review" → "Complete." Visual status for the entire team.

Multi-Project Dashboard

Manage multiple certification projects simultaneously. See all projects, their status, resource allocation, and upcoming milestones. Portfolio-level visibility for management.

Document Management & Workflows

Manage document reviews, approvals, and releases with built-in workflows. Side-by-side comparisons, comment tracking, and automated safeguards ensure nothing falls through the cracks.

Compliance document release page
Side-by-side document comparison for DOCX files
Document release with safeguards based on skills matrix
Document release with warnings based on project context
Image 1 of 4

Document release with full compliance tracking

Intelligent Project Reuse

Your past projects contain massive knowledge. CIVIRES helps you leverage it intelligently.

Requirements browsing showing Type Certificate Data Sheet coupling

Cross-aircraft requirement mapping and intelligent reuse

Cross-Aircraft Intelligence

Cloning a project from EC135 to AW109? CIVIRES maps requirements between aircraft types automatically. It suggests equivalent requirements, flags differences, lets you review and approve.

Transparency in Uncertainty

When CIVIRES can't confidently map a requirement, it tells you explicitly. No hidden assumptions, no silent failures.

Real-World Value

Same HEMS installation on three helicopter types? Clone and adapt. Save 60-70% of setup time on similar projects.

AI That Amplifies Your Expertise

Coming soon

CIVIRES uses AI to eliminate busy work and accelerate routine tasks—always with human oversight. The engineer stays in control; AI handles the tedious parts.

These AI capabilities are coming soon.

Automatic Compliance Summaries

CIVIRES analyzes requirement text and document content to draft compliance statements automatically. Both document-level summaries and requirement-specific statements. You review, edit, approve.

Intelligent Project Generation

Starting a similar project? CIVIRES suggests which requirements apply, which activities are typically needed, which documents will be required. Smart starting point based on your history.

Human-Augmented Approach

We don't replace airworthiness engineers with AI. We give engineers intelligent tools that handle repetitive tasks so they can focus on engineering that actually requires expertise.

Ready to Transform Your Certification?

These features work together to create something greater than the sum of parts: a complete certification management system that actually understands how Design Organisations work.